PROJECT GALLERY
WePackItAll
Phase two of complete build out for WePackIt All in the city of Duarte. Construction of 20 temperature-controlled packaging rooms and 3 temperature/humidity-controlled rooms. The production areas are all under positive air pressure and with 3 separate dust collection and filtration systems. The initial buildout also included 10,000 SF of office space.
WePackItAll
Phase two of complete build out for WePackIt All in the city of Duarte. Construction of 20 temperature-controlled packaging rooms and 3 temperature/humidity-controlled rooms. The production areas are all under positive air pressure and with 3 separate dust collection and filtration systems. The initial buildout also included 10,000 SF of office space.
| WePackItAll Front entrance to facilities |
| WePackItAll Expansion for additional packaging rooms. Hallway with epoxy flooring |
| WePackItAll Stainless steel sinks in lab area with epoxy flooring |
| WePackItAll Packaging room with dust collection, electrical, nitrogen, and electrical drops |
| WePackItAll Stainless steel hand wash sink. |
| WePackItAll Typical packaging room |
| WePackItAll Floor drain, eye wash station, and SS sink. |
| WePackItAll Dehumidification room for packaging |
| WePackItAll Initial phase of construction, multiple packaging rooms |
| WePackItAll Multiple dehumidification rooms. |
Call now: 714.630.8090
or fill out the form below
or fill out the form below












